Coal Handling Plant / Bulk Material Handling Plant

Promac provides complete turnkey system for coal / lignite handling systems for Captive and Thermal Power Plants. For a coal / lignite Handling Plant Promac provides a complete range of service which include:

  • Wagon Tippler system for unloading of coal
  • Apron feeders
  • Belt conveyor systems
  • Tripper conveyor for stacking
  • Bucket wheel type stacker cum reclaimers for Stacking & reclaiming
  • Reclaimers for blending
  • Ring granulators, Roll crushers
  • Dust extraction Systems
  • Electric overhead trolley (EOT) Cranes
  • Complete Electrical and Instrumentation System, Lighting etc

Promac also provides complete civil and structural work for the entire CHP including Ground hoppers, wagon tippler hopper or track hopper and tunnels, crusher house, transfer towers and complete structural supports.

Promac has a very impressive and large clientele including NTPC, KPCL, BHEL for whom Promac is an approved vendor for Coal Handling Plants.

Sl.No

Name of the Client

Description

Year of Execution

1

Karnataka Power Corporation Ltd, Bellary Thermal Power Station -Unit-1, Bellary, Karnataka, India

Complete Coal Handling Plant comprising of Wagon Tipplers, Stacker-Cum-Reclaimer, Crushers  and conveyors of 1250 TPH capacity for Bellary Thermal Power Station – Unit -1,   (1 x 500 MW) on turnkey basis.

2008

2

Karnataka Power Corporation Ltd, Raichur Thermal Power Station, Raichur, Karnataka, India

1260 TPH capacity Stacker-Cum-Reclaimer along with Associated Conveyor Systems on turnkey basis for RTPS-CHP-1

2011

3

Karnataka Power Corporation Ltd, Bellary Thermal Power Station – Unit-3, Bellary, Karnataka, India

Conveyor package for Coal Handling Plant of   1 x 700 MW on turnkey basis consisting of Apron Feeders and conveyors (1250 TPH) for Bellary Thermal Power Station – Unit -3.

Under Execution

4

Raichur Power corporation Ltd. Yeramaras Thermal Power Station, Karnataka, India

4 Sets of Wagon Tipplers (25 Tipples/hr), Side Arm Chargers, Apron Feeders (2200 TPH)  and Dribble Feeders for Coal Handling Plant Machine Package (2 x 800 MW TPP)

Under Execution

5

Karnataka Power Corporation Ltd, Raichur Thermal Power Station – Unit 5&6. Karnataka

Part Coal Handling system & complete Mill Reject handling system including Civil, Structural, Electrical work. (2 X 210 MW. 1250 TPH)

1999

6

Karnataka Power Corporation Ltd, Raichur Thermal Power Station  – Unit 7.  Karnataka

Extension of Coal Handling system & complete Mill Reject handling system including Civil, Structural, Electrical work. (1 X 210 MW. 1250 TPH)

2002

7

NTPC  Unchaar – Unit 6

1 X 210 Mw 1250 TPH CHP

1996